Power Usage Effectiveness (PUE) has become the de facto measure of data centre energy efficiency, comparing the total energy consumed by a data centre to the amount of energy that actually reaches the IT equipment.

However, the truth of the matter is that PUE is a very narrow metric. While it successfully addresses the power effectiveness of the data centre facility (power and cooling) it does not reveal anything about power effectiveness of the IT equipment within that facility (compute, storage and network).

To address this, The Green Grid launched its Data Center Maturity Model (DCMM) in 2011, which aims to give a holistic view of data centre sustainability and help organisations benchmark performance, determine levels of maturity, and identify ongoing steps and innovations to achieve greater energy efficiency in the future.

On the facility side, DCMM breaks the data centre down into four categories: power, cooling, management and “other”. Each of these categories is further broken down into sections, and data centre operators can score themselves in each category according to a range of criteria.

Similarly, on the IT side, DCMM breaks the data centre down into compute, storage, network and “other”. Scores range from 0 to 5, 0 being “minimal/no progress”, 2 being “best practice”, and 5 being “visionary”.

Operators not only fill in what they have achieved, but also their organisational targets. Based on the data entered, the DCMM tool also calculates a theoretical maximum level for each category, to help show organisations what they can realistically aim for.

All of this information can then be used to generate a “graphic equaliser” view of the data centre’s current maturity level, providing a visual representation of which areas of the data centre can be adjusted and improved:

Speaking at The Green Grid EMEA Forum in Brussels this week, Lex Coors, chief engineering officer at Interxion and member of The Green Grid's advisory council, said that the DCMM has value for both the C-suite and the operations perspective.

For the C-suite, it generates an overview of the organisation's current data centre maturity level, and puts future aspirations for energy efficiency and sustainability into context.

“If I gave my engineers a free hand in the data centre, they would design a 10,000m² facility with only one rack,” said Coors. “DCMM allows the C-suite to take the lead and decide how they want to position themselves from a sustainability point of view.”

It can also be a useful resource for data centre operators to explain to the C-suite where investment needs to be made to improve the overall sustainability of the facility. For example, if the data centre scores a level 3 for cooling and power, but only a level 1 for server efficiency, it might be worth investing in new servers.

“If you go to finance and say you want to change some of my equipment for a better model they won't understand why. But with a tool that clearly identifies the steps and different angles of advantage, they may be persuaded to give you the money,” said Coors.

From an operations perspective, DCMM creates a clear road map to improve energy efficiency and sustainability through benchmarking. Organisations can use the DCMM online tool to upload their data and compare their efficiency with other similar facilities.

It also helps engineers to design and upgrade their facilities with sustainability in mind from the offset, meaning that they can make informed choices about procurement and spend money wisely.

Last year, for example, online auction site eBay used The Green Grid's DCMM to guide the design and construction of its enormous data centre in Arizona. Despite being in the middle of the desert, the facility was able to slash costs and maximise energy efficiency, achieving a PUE rating of 1.35.


Share:

More from Techworld

More relevant IT news

Comments



Send to a friend

Email this article to a friend or colleague:

PLEASE NOTE: Your name is used only to let the recipient know who sent the story, and in case of transmission error. Both your name and the recipient's name and address will not be used for any other purpose.

Techworld White Papers

Choose – and Choose Wisely – the Right MSP for Your SMB

End users need a technology partner that provides transparency, enables productivity, delivers...

Download Whitepaper

10 Effective Habits of Indispensable IT Departments

It’s no secret that responsibilities are growing while budgets continue to shrink. Download this...

Download Whitepaper

Gartner Magic Quadrant for Enterprise Information Archiving

Enterprise information archiving is contributing to organisational needs for e-discovery and...

Download Whitepaper

Advancing the state of virtualised backups

Dell Software’s vRanger is a veteran of the virtualisation specific backup market. It was the...

Download Whitepaper

Techworld UK - Technology - Business

Innovation, productivity, agility and profit

Watch this on demand webinar which explores IT innovation, managed print services and business agility.

Techworld Mobile Site

Access Techworld's content on the move

Get the latest news, product reviews and downloads on your mobile device with Techworld's mobile site.

Find out more...

From Wow to How : Making mobile and cloud work for you

On demand Biztech Briefing - Learn how to effectively deliver mobile work styles and cloud services together.

Watch now...

Site Map

* *